4WORKING ENVELOPE 3m0m5m 5m1m2m3m4m 1m 2m 3m 4m0m1m13m2m4m4m5m6m7m8m9m10m11m12m0m1m2m3m4m5m6m7m8m9m10m11m12m13m5m 4 m 3m 2m 1m 0m 1m 2m 3m 5m
1. To operate the machine you must be medically fit and have no problems with eyesight or hearing. 2. You must have a good head for heights. 3
61. DO NOT operate this machine unless you have been fully trained in its safe use. 2. DO NOT operate the machine on soft, slippery or sloping gro
BEAUFORT WIND SPEED SCALEThe BeaufortScale of wind force is acceptedinternationally andis used in communicatingweather conditions. It consistsof num
1. Before towing, check the capacity of the vehicle being used. The standardmachine weighs 1300 kg (manual outriggers). (Machine weight may be greater
The following Pre-Start Checks should be carried out before taking the machine to the place of work. 1. Damaged or Loose Fittings. Visually Inspect
PRE-START CHECKS 10With the top and bottom booms raised approximately 500mm each, theunit switched off and the two Emergency Lower valves under the c
11CONTROLS, BATTERIES & POWER PACK BATTERIES BATTERY CHARGER OIL FILLER POWERPACK FIG. 3 DIPSTICKEMERGENCYSTOP LOWER CONTROL BOXCAGE CONTROLS‘GREE
1. Park the unit in an appropriate location at the workplace.2. Apply the handbrake on the trailer and remove from the towing vehicle.SETTING UPTake E
1. Park the unit in an appropriate location at the workplace. 2. Apply the handbrake on the trailer and remove from the towing vehicle. 3. Hydraulic
FIG. 514SETTING UP MOTORRUN HYDRAULIC VALVE LEVERS LEVEL BUBBLE Hydraulic Outriggers
From Cage Controls1. At the Ground Control Station, turn the key towards the ‘basket‘ icon.2. Climb into the basket. Check that all emergency stop swi
‘BLACK’ DESCENT BUTTONBOOMCONTROL LEVERSCage Controls - Fig. 916LOWERING STRUCTURE From Cage Controls1. Push and hold the ‘Black ’ descent button on
‘GREEN’ ELEVATEMOTOR RUN BUTTONSLEWCONTROL LEVERCage Controls Fig. 1017SLEWING THE STRUCTURE From Cage Controls1. Push and hold the ‘Green’ Motor Run
1. In accordance with IPAF recommendations, UpRight recommend the use of aFull Body Harness with an adjustable work restraint lanyard is used whenoper
Emergency StopStop buttons are fitted on the machine to stop the motor in an emergency. Inaddition to the basket emergency stop button, an emergency s
Emergency Slew / Rotate1. Turn the slew motor bypass ball valve 90 degrees anticlockwise.2. Remove the slew motor brake release protective cap usin
EMERGENCY CONTROLSEmergency Procedures (from the Ground) – Without Power1. Turn the 2 ball valves fitted under the cabinet 90 degrees (Fig 16 )– photo
1. Fully lower all the booms. 2. Manual Outriggers – wind up the screw jacks as far as t hey will go, unlock the spring bolts by pulling th
Daily Checks.1. Damaged or Loose Fittings.Visually Inspect the machine for signs of wear and tear, damage, loose ormissing parts.2. Wheels.Check tyres
Operation MANUALTL34When contacting Snorkel for service or parts information, always include the MODEL and SERIAL NUMBER from the machine namplate.ww
Weekly Checks.1. Apply grease to the slew gear wheel and all grease nipples. 2. Check battery acid level, top up with distilled water if required (m
2. Slew Drive Gears.The slew drive gear is designed to be largely maintenance free. However, werecommend the gear teeth be greased on a monthly basis
Pin No. Ref. Colour Function1L YELLOW L.H.INDICATOR254G BLUE FOG LIGHT(S)331 WHITE EARTH4R GREEN R.H. INDICATOR558R BROWN R.H. TAIL & No. PLATE654
Local Distributor / Lokaler Vertiebshändler / Distributeur localEl Distribuidor local / ll Distributore localeEUROPE, MIDDLE EASTAFRICA & ASIAPHON
CONTENT SECTIONIntroduction 1Description of Equipment 2Technical Specification 3Working Envelope 4Operat
UpRight has a global reputation for innovation and a proud heritage in thedesign and manufacture of high quality powered equipment.The company was fou
TheTL34 is a trailer mounted work platform with a 2-man cage giving access to maximum height of 12.20m. It offers safe, versatile and easy access for
Operating Dimensions Maximum Working Height 12.20 m Maximum Cage Height 10.20 m Maximum Outreach 5.00 m Outrigger Footprint (m
Kommentare zu diesen Handbüchern